Close scope gaps before it costs you.

RACOS reads your project documents, writes a scope of work and bid sheet for every trade, and surfaces gaps, errors, and omissions before contracts are signed.

Most disputes with subs start in the bid phase

Scope gaps are introduced when a responsibility gets missed. They surface in the field, when it costs the most.

Always under a deadline.

Documents that run hundreds to thousands of pages, with addenda and revisions arriving mid-bid.

Errors and omissions hiding in the documents.

A manual review of each trade, one at a time.

A familiar story

“The sump pump was on the architectural sheets. Plumbing never saw it.”

RACOS does the reading and the writing. You make the calls.

Every drawing sheet, down to the individual notes, callouts, and annotations. The specifications, section by section, with all reference documents and owner standards included. Send us everything.

Organized by trade.

What is on the sheets and in the specs, without anyone tagging it first. The same unit drawn five ways on five sheets is one component, and each one goes to a trade. Disagree? Reassign it, and the impacted scopes are updated.

The Evidence workspace

Written with receipts.

Not a regurgitation of everything. Line items stated clearly, in the order a PM reads it, with the sheets it came from underneath. Click the line and you are looking at the drawing. Edit anything, and every line carries receipts: the referenced documents, what changed, by who, why, and when.

ScopesSOW
AvailablePlumbing30 sections
1.

Subcontractor shall furnish and install a complete and operational domestic cold and hot water piping system, including aboveground and under-slab piping, risers, fittings, valves, and accessories, in accordance with the contract documents.

6 internal only items
2.

Subcontractor shall furnish and install complete water heater piping assemblies, including all valves, expansion tanks, heat traps, and thermal insulation per contract documents.

4 internal only items
3.

Subcontractor shall furnish and install complete and operational floor drains, hub drains, and associated trap priming assemblies, including all connections to water and waste systems, per contract documents.

7 internal only items
4.

Subcontractor shall furnish and install complete condensate drain piping systems from mechanical equipment to designated termination points, per contract documents.

3 internal only items
5.

Subcontractor shall furnish and install all water closets, urinals, and restroom fixtures complete and operational, including all flush valves, carriers, seats, and trim as indicated on the drawings and specified under Spec Section 2.3.

5 internal only items
6.

Subcontractor shall furnish and install all electric water coolers, emergency showers, and eyewash stations complete and operational, including all piping, valves, and specialized trim per contract documents.

3 internal only items
7.

Subcontractor shall furnish and install all exterior freeze-proof yard hydrants and recessed hose bibbs, including all boxes, vacuum breakers, and connection piping per contract documents.

2 internal only items
8.

Subcontractor shall furnish and install all gas regulators, solenoid valves, and associated control assemblies to provide a complete, safe, and operational emergency shut-off system in accordance with the contract documents.

3 internal only items
9.

Subcontractor shall perform all excavation, trenching, bedding, and backfilling required for underground plumbing and utility piping systems in accordance with the contract documents.

2 internal only items
10.

Subcontractor shall perform all testing, flushing, disinfection, and closeout activities for the domestic water distribution systems prior to final acceptance.

4 internal only items
Generating
Editing
Locked
Available

Example only. Not from a real project, and not a complete scope of work.

Flagged for review.

What no trade picked up, and what two trades both did, each as a card for your team to decide.

Decisions
Two trades, one item
Two trades, one item

Ask your project anything.

Natural language questions, answers grounded in your project data, citations back to specific sheets and spec sections.

Query•Ask questions about your project data
Drawing A2.3, Detail 4 specifies a self-adhered sheet membrane waterproofing system on all below-grade foundation walls, extending 12 inches above finished grade.1 Spec Section 07 10 00 requires a minimum 60-mil thickness with protection board.2
1A2.3Detail 4207 10 00p.12
Ask about your project data...

Example only. Not from a real project.

Decisions are tracked, not lost.

Every approval, rejection, and trade reassignment is captured with full context: who, what, when, and a note when someone left one. A structured record of how your team shaped each scope.

Activity Log
Date20 entries
Today
Domestic Water RiserPlumbing · Domestic Water
Plumbing
Condensate Drain PipingMechanical · HVAC Piping
Floor DrainsSheet P-101
Rooftop Unit Gas PipingMechanical · Fuel Gas
Yesterday
Thermostatic Mixing ValvesPlumbing · Plumbing Fixtures
Hose BibbsSheet P-201
Pipe InsulationMechanical · Insulation
Domestic Water RiserSheet P-601
Addendum 2

Domestic Water Riser

Plumbing · Domestic Water

Comments1 open · 0 resolved

Marcus RiveraConfirm riser sizing with @Sarah Chen before buyout1h ago
Timeline
Sarah Chen moved to Plumbing (was Mechanical)3:42 PM
Marcus Rivera Confirm riser sizing with @Sarah Chen before buyout3:15 PM
Emily Tran reassigned evidence “Water Heater Piping” → “Domestic Water Riser”10:20 AM

Sarah Chen · 1 event · Marcus Rivera · 1 event · Emily Tran · 1 event

Example only. Not from a real project.

Deliverables

  • A scope of work for every tradeWritten for this job and ready to go into the subcontract.
  • A bid sheet for every tradeThe lines your subs price, ready to send or to drop into the file you already level in.
  • The bid packageThe scope, your general requirements and the project details on the cover, written before you open the project. Subs price what is written instead of padding for what might be hiding.
  • On your letterheadEverything goes out looking like your firm sent it: PDF, Word or Excel.
The scope of work
The scope of work

Every project makes the next one smarter

In most offices the lessons learned live in somebody’s head. RACOS keeps them, and every project your team runs teaches it more about how your company works.

It learns how your company works

Fire caulking with MEP trades. “Trade partner,” not “subcontractor.” Low voltage as a separate trade. When your team makes the same call across projects, the trade reassignments, the renames, the way a line is worded, RACOS picks it up, and the next draft starts from it instead of a blank template.

Your standard, whoever runs the job

Your trades, your trade names, your letterhead. Set them up once, and every project comes out in your firm’s structure, no matter which PM or estimator picks it up. Customize per project as needed.

The office’s memory stays

When your best estimator moves on, their judgment stays: the assignments, the wording, the calls on what belongs to which trade. The next hire starts from your firm’s scopes and builds on everything the office already knows.